Category Archives: building phase

Porch Become Storage Building

The back porch was meant to be a place where we sat and enjoyed the sunset. Well…it was never used. This shows the importance of knowing the area where you are building. Our wind and weather comes in from the … Continue reading

Posted in building phase, Uncategorized | Tagged , , , | Leave a comment

No Longer Cooped Up

As you may know 2016 is the “Year of the Chicken” here at Cielito Lindo Ranch. This is the partial story about the new chicken coop that is currently under  construction. Initially a small coop was donated. A phone of … Continue reading

Posted in building phase | Tagged , , , , | Leave a comment

An Affordable Ceiling

When we first started planning the ceiling in the lodge at CLR, we talked about all kinds of different options. Vaulted, flat, tile, fixed, wood, and even tin. In the bedrooms, the ceiling was easy–we went for classic New Mexico … Continue reading

Posted in building phase | Tagged , , , , | Leave a comment

Why you never plaster over a hole!

The trouble with having help in to do plaster work is that sometimes it doesn’t get done right. As straw bales wall settle, they sometimes shift. If you’ve left a hole–of any size–the plaster is going to crack, and presto, … Continue reading

Posted in building phase, Uncategorized | Tagged , , , , , , , | Leave a comment

Spring (soon to plant)

Last year we tried a straw bale garden, planting directly into a straw bale. We didn’t have much luck with that. Our whiskey barrel containers worked better to hold the moisture, and the straw bales just dried out too much … Continue reading

Posted in building phase, Life in New Mexico | Tagged , , , , | Leave a comment

Bathroom in Progress

The bathroom has taken longer than we thought it would, in part because it’s been such a beautiful summer that we keep getting lured outside to do work (or play–it’s been perfect riding weather, and the wildflowers are hip high). … Continue reading

Posted in building phase | Tagged , , | Leave a comment

Plastering: Alis (or Aliz)

The interior plaster is done (everything but a few spots around the doors), so now it’s onto the next phase–the alis (or aliz) to smooth over the earth plaster. Like all plasters, first thing is to come up with a … Continue reading

Posted in building phase, research | Tagged , , | Leave a comment

Snow, Rain and Natrual Fiber Plaster

We’ve been covering the main lodge with natural fiber plaster (it’s earth based, with straw, fine sand, and wheat paste in it), and then adding alis over that. The two coats of plaster were great, but the aliz smoothed over … Continue reading

Posted in building phase, Life in New Mexico | Tagged , , , , , | Leave a comment

Artwork at the Lodge

This gallery contains 2 photos.

  Using an outside safe sculpting technique of clay (directly from site), wheat paste, shredded paper and sand, these raised sculptures were added to the outside structure of the lodge. These were then painted using earth minerals, ( from a … Continue reading

More Galleries | Leave a comment

Plastered

We’ve started the outside plaster work — it’s natural fiber stucco (earth plaster). And it’s going great. The first step with any plaster work is to get the mix right. This means some experimentation. Every bit of clay is different, … Continue reading

Posted in building phase | Tagged , , , , | Leave a comment